Navy's Fire Scout UAV Reaches Initial Production Phase | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Jun 01, 2007

Navy's Fire Scout UAV Reaches Initial Production Phase

VTOL Aircraft First Unmanned Navy System To Achieve Milestone

The US Department of Defense announced this week Northrop Grumman's MQ-8B Fire Scout VTOL-capable Tactical Unmanned Air Vehicle (VTUAV) has reached Milestone C, signifying the beginning of its low-rate initial production phase. The Fire Scout is the first unmanned aircraft system (UAS) within the US Navy, and the third UAS of all US military branches, to meet Milestone C in the Defense Department acquisition process.

"This is a significant step for the Fire Scout program and for unmanned systems overall," said Dyke Weatherington, Deputy of Unmanned Aircraft Systems Planning Task Force for the Office of the Secretary of Defense. "The military and contractor program offices have been diligent about meeting and exceeding requirements set forth for the new capabilities these systems offer the warfighter, including endurance, range and payload weight."

"With Milestone C complete, the Fire Scout program is on track to conduct payload flights this fall and enter initial operational evaluation and then achieve initial operational capability in 2008 as planned," said CDR Rob Murphy, Navy VTUAV program manager.

The Fire Scout's operational requirements include real-time video imagery collection, intelligence gathering, communications-relay capability, precision targeting and battle damage assessment from the Littoral Combat Ship.

The Navy has nine Fire Scouts currently on contract with Northrop Grumman. The first was delivered in November to Naval Air Station Patuxent River. The successful series of first flights was completed just weeks later. All nine are expected to be delivered by the end of 2008.

"At this time, we are supporting the Fire Scout system from our Unmanned Systems office located in Hollywood, MD to support flight test as well as the engineering and logistics needs of the Navy's VTUAV program," added Gene Fraser, vice president of Northrop Grumman's Unmanned Systems. "As the program grows, the number of Northrop Grumman support personnel will grow as well."

FMI: www.navy.mil, www.northropgrumman.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC