First Export Eurofighter Typhoon Flies | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Mar 23, 2007

First Export Eurofighter Typhoon Flies

Fighter Destined For Austrian Air Force

Aero-News learned Thursday the first Eurofighter Typhoon for an export nation successfully concluded its first flight at EADS Military Air Systems in Manching, Germany. Aircraft number AS001 -- the first to be delivered by the Eurofighter consortium of Alenia Aeronautica, BAE Systems, EADS CASA and EADS Germany to the Austrian Air Force -- was piloted by EADS test pilot Chris Worning and took off at 1115 local time.

During the flight, the aircraft was taken through a series of basic handling maneuvers, before touching down after approximately an hour.

"The aircraft handled impeccably as expected," Worning said. "The industrial consortium behind this next generation aircraft have already delivered unrivalled capability to the Partner Air Forces, and now Austria will begin to realize the force-multiplying benefits of this world-class weapon system that is already in operation in four nations."

"The flight of AS001 as the first Austrian Eurofighter Typhoon and the first export Eurofighter Typhoon, is a major milestone in the program," added Eurofighter GmbH CEO, Aloysius Rauen. "This achievement is the result of a successful cooperation of all Partner companies and suppliers, and demonstrates the ability of this international partnership to deliver to contract specification in export."

EADS representatives tell ANN AS001 is a Block 5 standard aircraft, representing the last build standard of Tranche 1. Under the terms of the contract, Austria will receive a total of 18 aircraft, with deliveries are scheduled to be completed in 2009.

The second aircraft for Austria, AS002, was rolled out only a few days earlier, and is now undergoing final checks before engine runs and the addition of Air Force colors to the aircraft. First flight is scheduled for April.

Nearly 640 Eurofighter Typhoons are on order, with 116 series production aircraft delivered to date to the four development partner nations --Germany, Italy, Spain and The United Kingdom.

FMI: www.eurofighter.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC