Army Celebrates Delivery of 100th Lakota | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Mar 18, 2010

Army Celebrates Delivery of 100th Lakota

Aircraft Will Be Deployed To Army's Joint Multinational Readiness Center In Germany

The 100th delivery of a UH-72A Lakota light utility helicopter was celebrated at a rollout ceremony at the American Eurocopter facility in Columbus, MS on March 11. The 100th Lakota aircraft will be deployed to Germany with the Army's Joint Multinational Readiness Center, becoming part of this unit's Combat Training Center and further expanding the Lakota's mission applications.

"The UH-72A Lakota program has progressed on schedule and within budget constraints," said Col. L. Neil Thurgood, the Army's project manager of the utility helicopter office. "The aircraft has been well received by Army aircrews and we have maintained a remarkably high operational availability rate combined with an admirable safety record. We especially look forward to fielding even more of these capable aircraft to Army National Guard units throughout the United States."

The Army plans to acquire 345 Lakotas through 2016, and the service has ordered 182 of the helicopters so far, along with five H-72A versions for the Navy. Aircraft already delivered to the Army are used in missions that include medical evacuation, search and rescue, drug interdiction, VIP transport and support, with the in-service UH-72A fleet logging more than 25,000 flight hours to date at an operational readiness rate of more than 90 percent.

"I am extremely proud of the team that developed this machine and I congratulate them on their first 100 deliveries of the 345 new aircraft the U.S. Army will buy," said Brig. Gen. Tim Crosby, program executive officer for aviation. "I am pleased to report that our units have maintained a near zero mishap rate while maintaining an operational availability rate of over 90 percent -- in the course of flying tens of thousands of hours with the Lakota."

The UH-72A is a Defense Acquisition Category I major defense acquisition program for the Defense Department, and the Lakota's service entry in 2007 marked one of the most rapid introductions of a new aircraft in the Army's history. Deliveries of the aircraft to National Guard units allow aging OH-58 and UH-1 rotary-wing aircraft to be retired, while UH-72As assigned to the active component of the Army free up UH-60 Black Hawks for assignment to war fighting missions.

For their service in Germany at the Joint Multinational Training Command, the helicopters will be used to train pilots in combat engagements, and are to carry equipment that includes a Multiple Integrated Laser Engagement System, a Smart On-Board Data Interface Module, and an electronic data manager.

When deployed to the Pacific Ocean's Kwajalein Atoll, the UH-72As will perform transport and support duties. They are to be painted in a high-visibility orange color scheme and outfitted with skid-mounted floats, a life raft and jettisonable cockpit doors for rapid egress.

Production of the UH-72A averages three to four helicopters per month at the Columbus production site, which is operated by EADS North America's American Eurocopter business unit. The 220,000-square-foot facility, located adjacent to the Golden Triangle Regional Airport, is capable of producing up to five aircraft a month.

FMI: www.army.mil

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC