Indonesia Places Blame For Lion Air Accident On Design And Oversight Lapses | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Sep 25, 2019

Indonesia Places Blame For Lion Air Accident On Design And Oversight Lapses

Draft Report Also Identifies Pilot Errors And Maintenance Mistakes

Design flaws by Boeing, lapses in oversight on the part of the FAA, and a string of pilot errors led to the crash of a Lion Air 737 MAX into the Java Sea almost a year ago, according to draft conclusions prepared by Indonesian investigators.

The Wall Street Journal reports that the details of the draft conclusions have not been disseminated, but they have been shared with the FAA and NTSB for comment. Boeing and the U.S. government agencies continue to work with Indonesian authorities, and plan to travel to that country to finalize the document. While the NTSB is not expected to have major disagreements with the draft, Boeing and the FAA are concerned that the documents will place too much emphasis on the design of the aircraft and the FAA's certification process.

The NTSB is expected to make safety recommendations calling for improvements in cockpit training and crew decision making. The board is also expected to have suggestions about the certifications of new airliners, including a reevaluation of the FAA's procedures delegating some certification authority to manufacturers.

Indonesia is also preparing safety recommendations related to the Boeing 737 MAX. None of those recommendations will be binding.

The FAA hopes that international aviation safety regulators will lift the grounding of the 737 MAX shortly after it recertifies the airplane, however EASA has said that it will conduct its own certification analysis before clearing the airplane to fly in European airspace, which could add months to the process.

The final version of the Indonesian report is expected to be released early in November, according to the report.

(Image from file)

FMI: Source report

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC