STS-124 Completes Second Spacewalk | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Jun 06, 2008

STS-124 Completes Second Spacewalk

Garan, Fossum Install Cameras On Kibo

Mission Specialists Mike Fossum and Ron Garan completed the second STS-124 spacewalk Thursday. The 7-hour, 11-minute excursion ended at 1815 EDT.

The astronauts completed a number of tasks to outfit the Kibo Japanese Pressurized Module, or JPM. They installed television cameras on the front and rear of the JPM to assist Kibo robotic arm operations, removed thermal covers from the Kibo robotic arm, and prepared an upper JPM docking port for Friday's attachment of the Kibo logistics module.

The spacewalkers installed two cameras on the Japan Aerospace Exploration Agency’s Kibo laboratory. NASA says these cameras will be used to judge clearances for the module’s robotic arm.

Garan and Fossum also prepared the laboratory’s top active common berthing mechanism for the attachment of the smaller section of the module, the Japanese Experiment Logistics Module -- Pressurized Section, which was delivered during STS-123.

In addition, the two spacewalkers made preparations for a nitrogen tank assembly swap they will make on their third spacewalk, scheduled for Sunday. They also removed an external television camera that had a failing power supply.

Fossum also inspected the space station's port solar alpha rotary joint, or SARJ. Unlike the starboard SARJ, the port SARJ has performed flawlessly. The inspection was done to ensure the port SARJ remains in good condition.

This was Fossum's fifth spacewalk, Garan's second, the 111th spacewalk devoted to space station assembly and maintenance, the 12th of 2008, and the 196th by  astronauts.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC