Ariane 5 For January 27 Mission Delivered To Final Assembly Building | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Jan 13, 2016

Ariane 5 For January 27 Mission Delivered To Final Assembly Building

Launcher And Payload Preparations Continue For First Flight Of 2016

Ariane 5 launcher and payload preparations are in progress in French Guiana for Arianespace's first flight of 2016, which will orbit the initial EpicNG high-throughput satellite for global operator Intelsat.

The heavy-lift vehicle for this upcoming mission - designated Flight VA228 - is now located inside the Spaceport's Final Assembly Building following its transfer by rail from the Launcher Integration Building atop a mobile launch table.

With Ariane 5 now under Arianespace's responsibility, the launcher is in position to receive its Intelsat 29e payload - which will be followed by final verifications and subsequent rollout to the Spaceport's ELA-3 complex for a January 27 liftoff.

Intelsat 29e's own preparations are advancing in parallel activity at the Spaceport's S5 payload processing building. Having already completed its initial check-out process inside this state-of-the-art facility's S5C clean room, the Boeing-built satellite is now being transferred to the S5A fueling and integration hall.

The January 27 liftoff will kick off another busy year of mission activity for Arianespace, which is targeting a 2016 performance of up to 11 flights using its full launcher family - consisting of the heavy-lift Ariane 5, medium-lift Soyuz and lightweight Vega - in side-by-side operation at the Spaceport.

(Image provided with Arianespace news release)

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC