BAE Systems Regional Aircraft Considers Launch Of Avro RJ Freighter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Aug 11, 2016

BAE Systems Regional Aircraft Considers Launch Of Avro RJ Freighter

Primary Airframe Would Be Older RJ100 Aircraft Coming Out Of Passenger Service

BAE Systems Regional Aircraft is working towards the possible launch of a passenger-to- freighter conversion program for the Avro RJ jetliner, and is seeking customer feedback to help assess market potential.

Building on the experience gained and in-service success of the BAE 146QT (Quiet Trader) freighter of which around 30 aircraft were produced, the business has spent the past year assessing the suitability of the newer-build Avro RJ as a freighter. This work has created a full OEM-designed specification for the freighter which is now being offered to the market.
 
The principal variant for conversion would be the RJ100 aircraft which are now starting to come out of passenger service and will be available over the next few years. The business can help potential customers source suitable aircraft.
 
Typically such aircraft can be bought for between $1-1.5 million and the freighter kit and conversion would cost between US$ 2.2 and 2.8 million. Availability would be from the end of 2017.
 
Most of these aircraft will have accumulated between 20,000 - 35,000 flight cycles (depending on aircraft age and history). BAE Systems offers an Avro RJ Life Extension Program which commences at 40,000 flight cycles and clears the aircraft life limit up to 60,000 flight cycles, ensuring many years of operational service. BAE Systems Regional Aircraft can provide a total support package, planned to last for at least a 15-20 year period.

BAE Systems will have a strategic MRO partner who will provide the freighter conversion or working party support solution to suit any need. Typical lead-time from contract will be 9-12 months and conversion time will be a round three months, subject to the specific modifications that are required.
 
In addition the business will work with any potential Avro RJ Freighter customers to develop bespoke specifications for the aircraft to suit differing requirements, including loadmaster seat, extended range, increased/re-distributed floor loading and remote operations.
 
The Avro RJ Freighter, which can carry up to 14 metric tons of cargo, fits the gap between the 7-metric ton freight capacity of current large turboprops and the 18 metric tons of the bigger Boeing 737 Classic freighter conversions.

(Images provided with BAE news release)

FMI: www.baesystems.com

 


Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC