Boeing Contracted To Build Rocket Stages For NASA’s Artemis Missions | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Oct 21, 2019

Boeing Contracted To Build Rocket Stages For NASA’s Artemis Missions

Company Completing First Space Launch System Core Stage; Second In Production

NASA and Boeing have initiated a contract for the production of 10 Space Launch System core stages and up to eight Exploration Upper Stages to support the third through the twelfth Artemis missions. Up to 10 additional core stages may be ordered under the contract, leveraging active labor, materials, and facility resources and supply chain efficiencies for production savings.

SLS is NASA's deep space exploration rocket that will launch astronauts in the 27-metric ton Orion crew vehicle, plus cargo, from Earth to the moon and eventually to Mars. Boeing is the prime contractor for the rocket’s core stage, avionics, and variations of the upper stage. The rocket is designed to be evolvable for missions beyond the moon. "We greatly appreciate the confidence NASA has placed in Boeing to deliver this deep space rocket and their endorsement of our team’s approach to meeting this unprecedented technological and manufacturing challenge in support of NASA’s Artemis program,” said Jim Chilton, senior vice president of Boeing’s Space and Launch division.

"Together with a nationwide network of engaged and innovative suppliers we will deliver the first core stage to NASA this year for Artemis I,” Chilton added. “This team is already implementing lessons learned and innovative practices from the first build to produce a second core stage more efficiently than the first. We are committed to continuous improvement as they execute on this new contract.”

Boeing designed, developed, tested and built the first SLS core stage under the original NASA Stages contract, including refurbishing the company’s manufacturing area at the Michoud Assembly Facility (MAF) in New Orleans, building test versions of the SLS structures, and designing more efficient, modern tooling, all while abiding by stringent safety and quality standards for human spaceflight. The second core stage is simultaneously in production at MAF.

Boeing last year delivered the first upper stage, the Interim Cryogenic Propulsion System, built by United Launch Alliance in Decatur, AL for the Block 1 version of the evolvable vehicle. The more powerful Exploration Upper Stage design for the Block 1B version is in development, while the MAF facility is being prepared for that build.

SLS is the only rocket that can carry the Orion, and necessary cargo, beyond Earth orbit in a single mission, making it a critical capability for NASA’s deep-space Artemis program.

“Boeing has implemented advanced manufacturing technologies for design, test, and production of the core stages, which will make both core stage production and upper stage development faster, more efficient, and safer,” said John Shannon, Boeing vice president and Space Launch System program manager. “The evolvable nature of the rocket will allow us to onboard new advances in materials and production technologies as we move forward to the moon and on to Mars.”

(Image provided with Boeing news release)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC