AD: Boeing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, May 24, 2007

AD: Boeing

AD NUMBER: 2007-11-08
MANUFACTURER: Boeing
SUBJECT: Airworthiness Directive 2007-11-08
SUMMARY:
The FAA is superseding an existing airworthiness directive (AD) that applies to all Boeing Model 727 airplanes. The existing AD requires a boost pump dry bay inspection to detect leakage of fuel through an arced-through conduit, and corrective action as necessary. The existing AD also requires repetitive inspections of the in-tank fuel boost pump wiring to detect chafing of the wire insulation, evidence of electrical arcing, or arc-through of the conduit wall, and applicable corrective action; and installation of sleeving over the in-tank fuel boost pump wires as a method to protect the wiring from chafing. This new AD removes certain inspection requirements from the existing AD. This new AD adds new repetitive inspections for damage of the electrical wire andsleeve that run to the fuel boost pump through a conduit in the fuel tank, and arcing damage ofthe conduit and signs of fuel leakage into the conduit; applicable investigative and corrective actions; and a new repetitive engine fuel suction feed operational test. Initiation of the new inspections terminates the requirements of the existing AD. This AD results from reports of a fuel tank explosion on a Model 727-200F airplane on the ground; and of chafed wires and a damaged power cable sleeve of a fuel boost pump that were discovered during an inspection required by an existing AD on a Model 737-300 airplane. We are issuing this AD to detect and correct chafingof the fuel boost pump electrical wiring and leakage of fuel into the conduit, and to prevent electrical arcing between the wiring and the surrounding conduit, which could result in arc-through of the conduit, and consequent fire or explosion of the fuel tank.

FMI: www.faa.gov/regulations_policies/airworthiness_directives/

Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC