NASA's Kepler Spacecraft Ready To Ship To Florida | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Dec 21, 2008

NASA's Kepler Spacecraft Ready To Ship To Florida

Hmmm... UPS, Or FedEx?

Here's one holiday package with a VERY high declared value. Engineers are getting ready to pack NASA's Kepler spacecraft into a container and ship it off to its launch site at Cape Canaveral Air Force Station, FL.

The mission, scheduled to launch on March 5, will seek to answer an age-old question -- are there other Earths in space? 

"Kepler is ready to begin its journey to its launch site, and ultimately to space, where it will answer a question that has been pondered by humankind at least as long ago as the ancient Greeks," said James Fanson, the project manager for the mission at NASA's Jet Propulsion Laboratory, Pasadena, CA.

Kepler will monitor more than 100,000 stars for signatures of planets of various sizes and orbital distances. It has the ability to locate rocky planets like Earth, including those that lie in a star's "habitable zone," a region where liquid water, and perhaps life, could exist. If these Earth-size worlds do exist around stars like our sun, Kepler is expected to be the first to find them, and the first to measure their frequency.

"Kepler's mission is to determine whether Earth-size planets in the habitable zone of other stars are frequent or rare; whether life in our Milky Way galaxy is likely to be frequent or rare," said William Borucki, the Kepler science principal investigator at NASA's Ames Research Center in Moffett Field, Calif.

Kepler is currently at Ball Aerospace & Technologies Corp. in Boulder, CO. It passed all its environmental tests ensuring that it is prepared for the harsh trip to space. It also passed what's called the "pre-ship review," meaning that it is ready to be shipped via convoy to Florida in early January. Its first stop will be Astrotech in Titusville, Fla., where the spacecraft will be processed before being carried to its launch pad at Cape Canaveral. Kepler will launch atop a Delta II rocket.

"An outstanding team of engineers overcame some difficult hurdles to achieve this considerable milestone," said Ball Aerospace Program Manager John Troeltzsch. "The culmination of this effort will put a spectacular mission in orbit designed to increase our understanding of the cosmos."

Kepler is a NASA Discovery mission. In addition to being the home organization of the science principal investigator, NASA Ames Research Center is responsible for the ground system development, mission operations and science data analysis. Kepler mission development is managed by JPL. Ball Aerospace & Technologies Corp. is responsible for developing the Kepler flight system and supporting mission operations.

FMI: www.nasa.gov/kepler, http://planetquest.jpl.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC