Santa Monica Considers Grass Overrun Areas After Runway Shortening | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Oct 03, 2017

Santa Monica Considers Grass Overrun Areas After Runway Shortening

Would Add $3.44 Million To The Project

The City of Santa Monica is considering using a process called hydro-seeding to grow grass where 1,500 feet of runway is slated to be removed from Santa Monica Airport (KSMO).

The Santa Monica Mirror reports that the installing the grass overruns at each end of the runway where the concrete will be removed would add $3.44 million to the project, bringing the cost to some $7 million. The city had apparently not considered what to do with the areas at each end of the runway when it initially approved funding for the runway shortening.

The City council was presented with a report "Options for the Removal of Excess Runway Pavement at Santa Monica Airport" at its September 26 meeting. The options ranged from $3.44 million to $5.7 million, with the grass option being the least expensive. That price does not include an irrigation system that would likely be required to maintain the grass.

The city told the paper that the airport does not currently have Runway Safety Areas at each end of the runway, and so it does not meet FAA safety standards. Airport advocates dispute that claim.

But it's also not clear how the project would be funded. In its report to the Council, the city staff said there "are no funds set aside or available in the City’s Fiscal Year 17-18 Capital Improvement Program (CIP) for this project. Additionally, the Airport Fund does not have sufficient reserves and could require a loan from the General Fund to remove the excess pavement.”

The council also accepted the resignation of Airport Commissioner Suzanne Paulson at the meeting, according to the report.

(Image from file)

FMI: Original Report

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC