100th ISS Spacewalk Will Examine Array Joint Issue | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Sat, Dec 15, 2007

100th ISS Spacewalk Will Examine Array Joint Issue

Whitson, Tani To Perform Analysis December 18

An important spacewalk outside the International Space Station is scheduled for next week, that NASA hopes will provide some answers regarding a mysterious problem with a solar array joint. Station Commander Peggy Whitson and Flight Engineer Dan Tani will perform the 100th spacewalk in support of ISS assembly on Tuesday, December 18. They will inspect the starboard Solar Alpha Rotary Joint (SARJ) and the Beta Gimbal Assembly (BGA).

The SARJ and BGA have been temporarily locked in place while the solar arrays still produce power. Whitson and Tani completed a procedure review on Friday and held a tagup with the lead spacewalk officer on the ground.

Kirk Shireman, station program deputy manager called the spacewalk a "fact-finding mission." The spacewalkers will report back to ground controllers what they find and return a trundle assembly back inside the station. Specialists on the ground will use the results to determine how to restore the starboard solar array's sun-tracking capability.

A move of the Mobile Transporter to worksite 4 in the center of the station's truss Friday from worksite 7 -- to provide micrometeoroid debris protection to the spacewalkers -- was postponed Friday after station cameras detected what appeared to be a piece of insulation on the truss track. Flight controllers continue to analyze the situation, according to NASA.

FMI: www.nasa.gov/mission_pages/station/main/index.html

Advertisement

More News

Airborne 05.20.24: Van's BK Exit, Bud Anderson, Air Race Classic

Also: ALPA Warns, Aviation Meteorology Reference, Jennifer Homendy Re-Ups, CAF Tampa Bay The court has approved Van's Aircraft's bankruptcy reorganization plans, settling a stressf>[...]

Airborne 05.20.24: Van's BK Exit, Bud Anderson, Air Race Classic

Also: ALPA Warns, Aviation Meteorology Reference, Jennifer Homendy Re-Ups, CAF Tampa Bay The court has approved Van's Aircraft's bankruptcy reorganization plans, settling a stressf>[...]

ANN's Daily Aero-Term (05.18.24): Flameout Pattern

Flameout Pattern An approach normally conducted by a single-engine military aircraft experiencing loss or anticipating loss of engine power or control. The standard overhead approa>[...]

ANN's Daily Aero-Linx (05.18.24)

Aero Linx: VC-25 - Air Force One The mission of the VC-25 aircraft — Air Force One — is to provide air transport for the president of the United States. The presidentia>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC