CASA Urgent AD: Pilatus PC-12 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Feb 16, 2005

CASA Urgent AD: Pilatus PC-12

AD Number: AD/PC-12/45
Subject:
Windshield De-Ice System Wiring - Inspection/Replacement
Applicability: Model PC-12 and PC-12/45 airplanes, Manufacturer Serial Numbers (MSN) 322 through MSN 400 inclusive.
Requirement: 1. Perform an inspection for signs of heat damage of the wires, splices and related link wires in the area of terminal block (TB152) in accordance of paragraph 3 of Pilatus PC-12 Service Bulletin (SB) 30-009.
2. Perform a check of the wires and related link wires to verify that wires of correct size (American Wire Gauge [AWG]) are installed as specified in paragraph 3.B. of SB 30-0009 and Wiring Manual (WM) 30-40-00 and 30-40-10.
3. If any signs of heat damage or incorrect wiring are found during the Requirements 1 and 2 inspections, replace them in accordance with SB 30-009. Note: FOCA Switzerland AD HB-2005-079 refers.
Compliance: For Requirements 1 and 2 - Within the next 10 hours time-in-service but not later than three calendar months after the effective date of this Directive. For Requirement 3 - Before further flight. This Airworthiness Directive becomes effective on 18 February 2005. Background: The Swiss Federal Office for Civil Aviation (FOCA) has advised of a report of a Co-Pilot’s windshield de-ice system failure. The cause of the defect was found in an overheating of the return wire from the windshield heating system. Investigation revealed that the installation of the wiring in question was not in accordance with the specifications given in the applicable wiring diagrams (incorrect AWG). This could result in heat damage of the wiring and as a consequence, electrical arcing or possible fire in the overhead panel in the flight-compartment.

FMI: http://casa.gov.au/avreg/aircraft/ad/ADfiles/UNDER/PC-12/PC-12-045.pdf


Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC