Transport Canada Updates Status On 737 MAX | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-Unlimited-05.28.24

Airborne-FlightTraining-05.29.24 Airborne-Unlimited-05.30.24

Airborne-Unlimited-05.24.24

Sun, Aug 30, 2020

Transport Canada Updates Status On 737 MAX

Flight Test Evaluations Took Place On August 26 And 27 In US Airspace

Transport Canada reports that it has "successfully completed a series of flight test activities of the updated aircraft as part of the validation process.

From August 23 to 25, 2020, Transport Canada’s flight test crew were flown to Seattle, Washington, to conduct evaluations on the engineering simulator at the Boeing facility and then at the end of the each test day, were flown back to Vancouver."

The flight test evaluations took place on August 26 and 27 in U.S. airspace using the Boeing test aircraft.

Transport Canada adds that, “The Government of Canada remains committed to keeping Canadians, the travelling public, and the transportation system safe and secure... Transport Canada continues to work extensively with the United States Federal Aviation Administration (FAA) and civil aviation authorities in Europe and Brazil throughout the validation process of the Boeing 737 Max 8 aircraft."

The back and forth travel had an underlying strategy -- Mitigation measures due to the COVID-19 pandemic had been established for the validation activities, including the flight tests, to ensure the health and safety of Transport Canada employees.

Canada is reportedly the first international regulator to complete validation testing activities of the aircraft. Transport Canada is now analyzing the results of these tests and will determine, through its own independent review, whether to validate the proposed changes.

Marc Garneau, the Minister of Transport, reiterates that, “Transport Canada will not lift the flight restrictions on the Boeing 737 MAX 8 until the department is fully satisfied that all safety concerns have been addressed by the manufacturer and the FAA, and that enhanced flight crew procedures and training are in place.”

In the next few weeks, Transport Canada will participate in a Joint Operational Evaluation Board, which is made up of representatives from global certification authorities. The results of the Board will be used to establish the minimum training requirements for the return to service of the 737 MAX 8 aircraft.

FMI: https://tc.canada.ca

Advertisement

More News

ANN's Daily Aero-Term (06.01.24): Hold For Release

Hold For Release Used by ATC to delay an aircraft for traffic management reasons; i.e., weather, traffic volume, etc. Hold for release instructions (including departure delay infor>[...]

ANN's Daily Aero-Linx (06.01.24)

Aero Linx: International Academy of Aviation and Space Medicine (IAASM) The Academy was founded in 1955, with the object of searching for and promoting new knowledge in Aviation an>[...]

Aero-News: Quote of the Day (06.01.24)

“As FedEx begins its journey to restructure under the ‘One FedEx’ strategy, our pilots remind management that there’s still unfinished business to address i>[...]

Airborne 05.31.24: 1Q GA Sales, 200th ALTO LSA, Spitfire Grounding

Also: NATA CEO In Legal Dilemma, WestJet Encore Settle, Drone Bill H.R. 8416, USN Jet Trainer GAMA released their 1Q/24 GA Aircraft Shipment and Billing Report -- with mostly mixed>[...]

ANN's Daily Aero-Term (06.02.24): Mach Technique [ICAO]

Mach Technique [ICAO] Describes a control technique used by air traffic control whereby turbojet aircraft operating successively along suitable routes are cleared to maintain appro>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC