Boeing B787 Update: Dreamliner Flies! | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Dec 15, 2009

Boeing B787 Update: Dreamliner Flies!

Flight Plan Has Been Filed, Weather 'OK'

ANN Realtime Update 1638 EST 12.15.2009: The Dreamliner has Landed. Following a flight of just over three hours mostly to the west of Seattle, the B787 Dreamliner has completed its first flight, landing at Boeing Field (KBFI) at 1632 EDT. Chief Pilot Mike Carriker executed a picture-perfect landing in Boeing's new airplane. ANN will have reaction from the pilots and an official statement from Boeing about the flight when they are available, but this will be considered by some to be an historic day in aviation: the first flight of the first composite airliner. Congratuations to Boeing and those who worked on this airplane for years for a day to remember.

 

Boeing Video Capture

ANN Realtime update 1500 EST  12.15.2009: Chief Pilot Mike Carriker, and Engineering Test Pilot Randy Neville are charting something of a wandering course over the Pacific Northwest on the Dreamliners' first flight. The crew took off from Paine Field (KPAE) at about 1330 EST Tuesday afternoon, and has currently been airborne for about 90 minutes. Flight Aware is charting the course online, and it looks like a decent day for flying up around Seattle.

Courtesy Flight Aware

The flight was planned for more than 5 hours, but Boeing said the duration of the flight would be at the pilot's discretion. The landing is planned for Boeing Field (KBFI), but that could change as well due to local weather conditions.

ANN Realtime Update 1329 EST  12.15.2009: The Dreamliner Has Departed Paine Field On It's First Flight!

Boeing Video Capture

ANN Realtime Update 1313 EST  12.15.2009: Dreamliner is taxiing to the active runway. Next update will be at takeoff.

Boeing Video Capture

ANNRealtime Update 1308 EST  12.15.2009:  Boeing officials are conducting a final security sweep before moving the first Dreamliner from its stall at the factory to the taxiway. Thousands of Boeing employees are gathered on the airport grounds to watch the long-delayed airplane finally take flight.

Original Story: Boeing is finalizing plans for the maiden flight of the B787 Dreamliner in Everett, Washington at 1300 EST. A flight plan (KPAE PAE360019 MLP340019 PAE360019 MLP340019 GLASR GLASR7 KBFI) has been filed for the flight, and the weather appears to be cooperating. The flight will start at Paine Field (KPAE)  and terminate at Boeing Field (KBFI).

HeraldNet of Snohomish county reports that the best viewing areas near Paine Field began filling up early today. Flight Aware indicates that flight BOE1 is expected to last 5 hours and 44 minutes from its 1000 PST liftoff today. The forecast is calling for a scattered deck at about 1500 ft, and overcast at 2500 ft, calm to light winds out of the southeast, a temperature just under 40 degrees, and some rain is possible later in the day.

This first flight carries only needed flight test crew... though later flights will be accompanied by a virtual army of flight test engineers. The first Boeing 787 is registered as N787BA and will be under the command of Boeing's Chief Pilot Mike Carriker, and Engineering Test Pilot Randy Neville. Currently, the aircraft is expected to depart on Rwy 34L.

ANN will be providing realtime updates for you through the afternoon as the flight progresses.

FMI: http://787firstflight.newairplane.com/ffindex.htmlwww.boeing.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC