TRU Simulation + Training To Provide 2 FFSs To Boeing For 777X | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Mar 20, 2017

TRU Simulation + Training To Provide 2 FFSs To Boeing For 777X

Will Be Installed At Campuses In The U.K. And Singapore

TRU Simulation + Training has received purchase orders from Boeing for the production of two Full Flight Simulator (FFS) suites for Boeing’s newest twin-aisle airliner, the 777-9.

The purchase order for the two FFS suites follows an April 2016 announcement where the two companies entered into a multi-year agreement that established TRU as Boeing’s supplier for the entire suite of 777-9 flight simulation training equipment. While the 2016 announcement called for TRU to provide one training suite consisting of a 777-9 Full Flight Simulator and a high-fidelity classroom, Boeing has now increased its order by one additional training suite.

Boeing’s new order expands TRU’s relationship with the world’s largest aerospace company. “The continued trust Boeing is placing in our company with this latest order clearly signals TRU is a leading and trusted supplier in the flight simulation and training industry,” said George Karam, Vice President and General Manager of TRU’s Air Transport Simulation division. “Boeing customers expect the highest standards of innovation, quality, fidelity and safety in their training programs. We believe that the selection of TRU for the development and supply of an additional full flight training suite for the 777-9 is a vote of confidence in TRU’s technology.”

The two FFS suites will be delivered and installed in Boeing training campuses in Singapore and the United Kingdom. The suites are expected to be delivered and operational in the second half of 2019.

(Source: Textron media release. Image from file)

FMI: www.textron.com

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC