NGC, US Navy Successfully Conduct E-2D Advanced Hawkeye Aerial Refueling CDR | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Jul 06, 2015

NGC, US Navy Successfully Conduct E-2D Advanced Hawkeye Aerial Refueling CDR

Capability Will Extend E-2D Advanced Hawkeye Flight Endurance

The U.S. Navy and Northrop Grumman have successfully conducted the critical design review (CDR) for the E-2D Advanced Hawkeye Aerial Refueling (AR) system.

"The AR team continues to put outstanding effort into bringing this much needed capability to the E-2D Advanced Hawkeye," said Capt. John Lemmon, program manager, E-2/C-2 Airborne Tactical Data System Program Office (PMA-231). "Aerial Refueling will enable the E-2D Advanced Hawkeye to provide longer on-station times at greater ranges."

Under a $226.7 million engineering, manufacturing and development (EMD) contract awarded in 2013, Northrop Grumman is designing, developing, manufacturing and testing several sub-system upgrades necessary to accommodate an aerial refueling capability.

Approval of this critical milestone demonstrates design maturity and acknowledgement that the program is ready to transition to the build/test phase. CDR also moves the program closer to installing this capability on new production aircraft. The E-2D aircraft already in service will be retrofitted with the aerial refueling capability.

"Achieving this critical milestone moves the program one step closer to fielding this much needed capability to the Warfighter," said Jane Bishop, vice president, E-2/C-2 programs, Northrop Grumman.

Installation of the developmental Aerial Refueling subsystem and flight test instrumentation onto the E2D test aircraft will commence in the second quarter of FY2016 at Northrop Grumman's St. Augustine manufacturing facility. Flight testing for the AR-equipped E-2D test aircraft is planned for FY2017, with Initial Operational Capability (IOC) expected in FY2020.

(Image provided by Northrop Grumman)

FMI: www.northropgrumman.com, www.navy.mil

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC