NGC, US Navy Successfully Conduct E-2D Advanced Hawkeye Aerial Refueling CDR | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Jul 06, 2015

NGC, US Navy Successfully Conduct E-2D Advanced Hawkeye Aerial Refueling CDR

Capability Will Extend E-2D Advanced Hawkeye Flight Endurance

The U.S. Navy and Northrop Grumman have successfully conducted the critical design review (CDR) for the E-2D Advanced Hawkeye Aerial Refueling (AR) system.

"The AR team continues to put outstanding effort into bringing this much needed capability to the E-2D Advanced Hawkeye," said Capt. John Lemmon, program manager, E-2/C-2 Airborne Tactical Data System Program Office (PMA-231). "Aerial Refueling will enable the E-2D Advanced Hawkeye to provide longer on-station times at greater ranges."

Under a $226.7 million engineering, manufacturing and development (EMD) contract awarded in 2013, Northrop Grumman is designing, developing, manufacturing and testing several sub-system upgrades necessary to accommodate an aerial refueling capability.

Approval of this critical milestone demonstrates design maturity and acknowledgement that the program is ready to transition to the build/test phase. CDR also moves the program closer to installing this capability on new production aircraft. The E-2D aircraft already in service will be retrofitted with the aerial refueling capability.

"Achieving this critical milestone moves the program one step closer to fielding this much needed capability to the Warfighter," said Jane Bishop, vice president, E-2/C-2 programs, Northrop Grumman.

Installation of the developmental Aerial Refueling subsystem and flight test instrumentation onto the E2D test aircraft will commence in the second quarter of FY2016 at Northrop Grumman's St. Augustine manufacturing facility. Flight testing for the AR-equipped E-2D test aircraft is planned for FY2017, with Initial Operational Capability (IOC) expected in FY2020.

(Image provided by Northrop Grumman)

FMI: www.northropgrumman.com, www.navy.mil

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC