AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Fri, Sep 28, 2018

AD: The Boeing Company Airplanes

AD NUMBER: 2018-19-20

PRODUCT: Certain Boeing Model 737-200, -300, -400, and -500 series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2010-25-06, which applied to the aircraft listed above.

AD 2010-25-06 required repetitive inspections for cracking of certain fuselage frames and stub beams, and corrective actions if necessary.

AD 2010-25-06 also provided for an optional repair, which terminated the repetitive inspections. For airplanes on which a certain repair was done, AD 2010-25-06 also required repetitive inspections for cracking of certain fuselage frames and stub beams, and corrective actions if necessary.

This AD retains the actions required by AD 2010-25-06 and expands the inspection area. This AD was prompted by additional cracking found in areas not covered by the inspections in AD 2010-25-06.

DATES: This AD is effective October 31, 2018.

COST: The FAA estimates that this AD affects 67 airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • Inspections - Up to 67 work-hours × $85 per hour = $5,695 per inspection cycle.
  • Repairs/replacements - Up to 76 work-hours × $85 per hour = $6,460* per aircraft

* All required parts are supplied by the operator. This cost is minimal, and the FAA has no way to determine what an operator would pay for these parts. The FAA has received no definitive data that would enable us to provide cost estimates for certain other repairs specified in this AD.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC