Ariane 5 For Arianespace's 6th Flight Of 2009 Is Ready For Assembly | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Aug 25, 2009

Ariane 5 For Arianespace's 6th Flight Of 2009 Is Ready For Assembly

Arianespace Targets 7 Launches For 2009

Launcher elements for the sixth mission in 2009 with Arianespace's workhorse Ariane 5 in 2009 are now at the Company's South American Spaceport, and are ready for assembly as the newest heavy-lift vehicle. These components were delivered aboard the MN Colibri, which is one of two sea-going vessels that transport Arianespace launchers from their manufacturers in Europe.

Using the MN Colibri's roll-on/roll-off configuration, the Ariane 5's cryogenic core stage and upper stage were driven from the ship at Pariacabo port near the city of Kourou to the Spaceport - where they were positioned in the Launcher Integration Building's receiving area. This launcher will be the 192nd Ariane family vehicle assembled at the Spaceport. It is part of a record year for mission activity with the Ariane 5, during which Arianespace is targeting a total of seven launches.

Ariane 5 File Photo

The 190th Ariane family vehicle lifted off from the Spaceport's ELA-3 launch pad late last week, using a heavy-lift Ariane 5 ECA to orbit the JCSAT-12 and Optus D3 telecommunications satellites. It was Arianespace's fourth flight with the Ariane 5 in 2009. Arianespace's next mission - the 191st flight for a member of the Ariane family - will utilize an Ariane 5 ECA that has completed its build-up in the Launcher Integration Building. This vehicle is now ready for its transfer to the Spaceport's Final Assembly Building.

FMI: www.arianespace.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC