Radium Plane Parts Removed From LA Warehouse | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Apr 01, 2005

Radium Plane Parts Removed From LA Warehouse

Part Of $9.3 Million Cleanup

The EPA says it's removed more than a million airplane parts -- mostly control indicators -- from a warehouse in Los Angeles that were built with radium and, according to the federal agency, posed a radiation hazard.

"We've done a number of radiation contamination (cleanups), but I don't recall a dial cleanup in the past," said Keith A. Takata, director of the Environmental Protection Agency's Superfund division, in an interview with the LA Daily News. "A single dial leaking radiation isn't a big problem. But a million of them, and many of them broken, becomes a big problem."

The parts were stored at Preservation Aviation Warehouse in North Hollywood. As ANN reported last June, the gauges came mostly from scrapped WWII aircraft. As the cleanup was getting underway, officials estimated its cost at about $7 million. But the EPA spent $5 million on sending the parts to secure landfills capable of handling radioactive waste. The price tag has now climbed to $9.3 million and EPA officials say they'll do all they can to recover at least some of that cost from the owners of Preservation Aviation.

Radiation levels -- once 100 times background levels inside the warehouse and 10 times normal in the yard -- have now returned to normal, according to Takata. Officials will reportedly decide next week whether the warehouse should be demolished altogether.

FMI: www.epa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC