Radium Plane Parts Removed From LA Warehouse | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Apr 01, 2005

Radium Plane Parts Removed From LA Warehouse

Part Of $9.3 Million Cleanup

The EPA says it's removed more than a million airplane parts -- mostly control indicators -- from a warehouse in Los Angeles that were built with radium and, according to the federal agency, posed a radiation hazard.

"We've done a number of radiation contamination (cleanups), but I don't recall a dial cleanup in the past," said Keith A. Takata, director of the Environmental Protection Agency's Superfund division, in an interview with the LA Daily News. "A single dial leaking radiation isn't a big problem. But a million of them, and many of them broken, becomes a big problem."

The parts were stored at Preservation Aviation Warehouse in North Hollywood. As ANN reported last June, the gauges came mostly from scrapped WWII aircraft. As the cleanup was getting underway, officials estimated its cost at about $7 million. But the EPA spent $5 million on sending the parts to secure landfills capable of handling radioactive waste. The price tag has now climbed to $9.3 million and EPA officials say they'll do all they can to recover at least some of that cost from the owners of Preservation Aviation.

Radiation levels -- once 100 times background levels inside the warehouse and 10 times normal in the yard -- have now returned to normal, according to Takata. Officials will reportedly decide next week whether the warehouse should be demolished altogether.

FMI: www.epa.gov

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC