Boeing On Schedule To Deliver World’s 1st All-Electric Satellites | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sun, Mar 30, 2014

Boeing On Schedule To Deliver World’s 1st All-Electric Satellites

Primary Structures Completed For Two Boeing 702SP Spacecraft For ABS And Eutelsat

Boeing is on track to deliver the world's first all-electric propulsion satellites in late 2014 or early 2015 as it has met key production milestones on its initial 702SP (small platform) satellites, the company said in a news release Monday.

Boeing recently completed static qualification testing, verification and assembly of the primary structures for 702SP inaugural customers ABS and Eutelsat, with the spacecraft scheduled to be launched as a pair in a stacked configuration. The initial contract was signed in 2012 between Boeing and Satmex. Eutelsat acquired Satmex in January 2014.

"We will be first to launch a commercial all-electric satellite, providing customers new flexibility and next-generation technology for increased performance," said Craig Cooning, vice president and general manager of Boeing Space & Intelligence Systems. "The all-electric propulsion design gives customers more affordable launch options and the ability to nearly double payload capacity."

Boeing is building two pairs of 702SP satellites under a joint four-satellite agreement with ABS and Eutelsat. Production on the 702SP satellites began in 2013, after the spacecraft passed its critical design review.

(Image provided by Boeing)

FMI: www.boeing.com

 


Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC