Navy's Fire Scout UAV Reaches Initial Production Phase | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-NextGen-05.21.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Fri, Jun 01, 2007

Navy's Fire Scout UAV Reaches Initial Production Phase

VTOL Aircraft First Unmanned Navy System To Achieve Milestone

The US Department of Defense announced this week Northrop Grumman's MQ-8B Fire Scout VTOL-capable Tactical Unmanned Air Vehicle (VTUAV) has reached Milestone C, signifying the beginning of its low-rate initial production phase. The Fire Scout is the first unmanned aircraft system (UAS) within the US Navy, and the third UAS of all US military branches, to meet Milestone C in the Defense Department acquisition process.

"This is a significant step for the Fire Scout program and for unmanned systems overall," said Dyke Weatherington, Deputy of Unmanned Aircraft Systems Planning Task Force for the Office of the Secretary of Defense. "The military and contractor program offices have been diligent about meeting and exceeding requirements set forth for the new capabilities these systems offer the warfighter, including endurance, range and payload weight."

"With Milestone C complete, the Fire Scout program is on track to conduct payload flights this fall and enter initial operational evaluation and then achieve initial operational capability in 2008 as planned," said CDR Rob Murphy, Navy VTUAV program manager.

The Fire Scout's operational requirements include real-time video imagery collection, intelligence gathering, communications-relay capability, precision targeting and battle damage assessment from the Littoral Combat Ship.

The Navy has nine Fire Scouts currently on contract with Northrop Grumman. The first was delivered in November to Naval Air Station Patuxent River. The successful series of first flights was completed just weeks later. All nine are expected to be delivered by the end of 2008.

"At this time, we are supporting the Fire Scout system from our Unmanned Systems office located in Hollywood, MD to support flight test as well as the engineering and logistics needs of the Navy's VTUAV program," added Gene Fraser, vice president of Northrop Grumman's Unmanned Systems. "As the program grows, the number of Northrop Grumman support personnel will grow as well."

FMI: www.navy.mil, www.northropgrumman.com

Advertisement

More News

Samson Sky Hits the Wind Tunnel

Improvements Stack as Brand Readies for Mass Production Samson Sky updated followers on its flying car progress, describing some of the travails of the wind tunnel as they get clos>[...]

ANN's Daily Aero-Term (05.22.24): LAHSO

LAHSO An acronym for “Land and Hold Short Operation.” These operations include landing and holding short of an intersecting runway, a taxiway, a predetermined point, or>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Linx (05.19.24)

Aero Linx: Space Medicine Association (SMA) The Space Medicine Branch was founded in 1951 as the first constituent organization of the Aerospace Medical Association (AsMA). In 2006>[...]

ANN's Daily Aero-Term (05.19.24): Back-Taxi

Back-Taxi A term used by air traffic controllers to taxi an aircraft on the runway opposite to the traffic flow. The aircraft may be instructed to back-taxi to the beginning of the>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC