NASA Looks At Changes In Final Two Shuttle Launch Dates | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Apr 28, 2010

NASA Looks At Changes In Final Two Shuttle Launch Dates

Alpha Magnetic Spectrometer Mission Pushed Into November

NASA is planning to make some changes to the target launch dates for the last two scheduled space shuttle flights. Scientists with the Alpha Magnetic Spectrometer, or AMS, program recently decided to change out the current magnet in the particle physics experiment module that will be attached to the International Space Station to a longer lasting one.

This will take advantage of NASA's plan to extend station operations until at least 2020. Because of the magnet change, space shuttle Endeavour's STS-134 mission, which will carry the AMS experiment to the station and was targeted to launch July 29, now is expected to launch no earlier than mid-November 2010. An exact target launch date still is TBD. AMS is designed to help study the formation of the universe and search for evidence of dark matter and antimatter by measuring cosmic rays.

Space shuttle Discovery's STS-133 mission currently remains targeted for its Sept. 16 launch date, but managers will continue to assess its readiness for flight and make changes as appropriate.


Atlantis File Photo

The next shuttle flight, Atlantis' STS-132 mission targeted for launch on May 14, remains on track with no changes. At NASA's Kennedy Space Center in Florida where Atlantis is being readied for liftoff at Launch Pad 39A, the payload for the flight, an Integrated Cargo Carrier and a Russian-built Mini Research Module, was installed in the shuttle's cargo bay Sunday. Today, technicians hooked up the quick disconnects for Atlantis's two solid rocket boosters. And Atlantis' six astronauts crew took care of administrative tasks at Johnson Space Center in Houston.

FMI: www.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC