NASA Looks At Changes In Final Two Shuttle Launch Dates | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Wed, Apr 28, 2010

NASA Looks At Changes In Final Two Shuttle Launch Dates

Alpha Magnetic Spectrometer Mission Pushed Into November

NASA is planning to make some changes to the target launch dates for the last two scheduled space shuttle flights. Scientists with the Alpha Magnetic Spectrometer, or AMS, program recently decided to change out the current magnet in the particle physics experiment module that will be attached to the International Space Station to a longer lasting one.

This will take advantage of NASA's plan to extend station operations until at least 2020. Because of the magnet change, space shuttle Endeavour's STS-134 mission, which will carry the AMS experiment to the station and was targeted to launch July 29, now is expected to launch no earlier than mid-November 2010. An exact target launch date still is TBD. AMS is designed to help study the formation of the universe and search for evidence of dark matter and antimatter by measuring cosmic rays.

Space shuttle Discovery's STS-133 mission currently remains targeted for its Sept. 16 launch date, but managers will continue to assess its readiness for flight and make changes as appropriate.


Atlantis File Photo

The next shuttle flight, Atlantis' STS-132 mission targeted for launch on May 14, remains on track with no changes. At NASA's Kennedy Space Center in Florida where Atlantis is being readied for liftoff at Launch Pad 39A, the payload for the flight, an Integrated Cargo Carrier and a Russian-built Mini Research Module, was installed in the shuttle's cargo bay Sunday. Today, technicians hooked up the quick disconnects for Atlantis's two solid rocket boosters. And Atlantis' six astronauts crew took care of administrative tasks at Johnson Space Center in Houston.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC