Four Navy E-6B Mercury 'TACAMO/ABNCP' Planes Set For Comm Upgrade | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Feb 21, 2011

Four Navy E-6B Mercury 'TACAMO/ABNCP' Planes Set For Comm Upgrade

ARINC Will Modify The Aircraft For Rockwell Collins

A major communication systems upgrade on U.S. Navy E-6B aircraft that are part of the Take Charge And Move Out (TACAMO) strategic communications relay mission and the Airborne Command Post (ABNCP) command and control missions will be performed by ARINC Engineering Services based in Annapolis, MD.


E-6B File Photo

Under a subcontract just received from Rockwell Collins, ARINC will install Rockwell's Block I avionics modifications on multiple Navy E-6B aircraft, effectively upgrading most of the advanced communications systems on board.

The Navy E-6B is designed to provide survivable and endurable command, control and communications in support of the President, Secretary of Defense, Chairman of the Joint Chiefs of Staff, and United States Strategic Command. Built on the Boeing 707 airframe, the E-6B has a range of 5,500 miles, accommodates 23 crew members, and is equipped with an Airborne Launch Control System capable of launching U.S. land-based intercontinental ballistic missiles. The U.S. Navy has a total fleet of sixteen E-6B aircraft deployed from Tinker AFB.

ARINC had previously completed upgrade work for Rockwell on the OC-135 and KC-135 aircraft. The company will perform the E-6B Block I work at its Aircraft Modification and Operations Facility in Oklahoma City, OK. Completion is expected to take about 26 months, with induction of the first aircraft scheduled for July 2011 and final delivery by September 2013.

Under the contract, ARINC will perform comprehensive removal, upgrading, and replacement of the receivers, transmitters, communications racks, and operator stations that support the aircraft's Communications Central and Battle Staff suites. The same Block I modifications will be made on an existing Mission Avionics Systems Trainer currently used at Tinker Air Force Base. Personnel from Rockwell Collins and the Navy customer, NAVAIR PMA-271, Patuxent River, MD, are expected to supervise the E-6B upgrade work at Oklahoma City.

ARINC recently launched the design and construction of a second hangar at its OKC facility, which will more than double available hangar space when it opens in June.

FMI: www.arinc.com

Advertisement

More News

ANN's Daily Aero-Linx (05.04.24)

Aero Linx: JAARS Nearly 1.5 billion people, using more than 5,500 languages, do not have a full Bible in their first language. Many of these people live in the most remote parts of>[...]

NTSB Final Report: Quest Aircraft Co Inc Kodiak 100

'Airplane Bounced Twice On The Grass Runway, Resulting In The Nose Wheel Separating From The Airplane...' Analysis: The pilot reported, “upon touchdown, the plane jumped back>[...]

Aero-News: Quote of the Day (05.04.24)

"Burt is best known to the public for his historic designs of SpaceShipOne, Voyager, and GlobalFlyer, but for EAA members and aviation aficionados, his unique concepts began more t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Read/Watch/Listen... ANN Does It All

There Are SO Many Ways To Get YOUR Aero-News! It’s been a while since we have reminded everyone about all the ways we offer your daily dose of aviation news on-the-go...so he>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC