AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Aug 29, 2020

AD: The Boeing Company Airplanes

AD 2020-17-04 Required Installing Lanyard Assemblies On The Passenger Service Units

The FAA is superseding Airworthiness Directive (AD) 2019-03-06, which applied to certain The Boeing Company Model 737-300, -400, and -500 series airplanes.

AD 2019-03-06 required installing lanyard assemblies on the passenger service units (PSUs) and, for certain airplanes, on the life vest panels. This AD was prompted by a report indicating that the PSUs became separated from their attachments during several survivable accident sequences, and by the determination that additional actions are necessary for five airplanes. This AD retains the requirements of AD 2019-03-06 and also requires installation of lanyard assemblies on the life vest panels on those five airplanes. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective September 29, 2020.

Supplementary Information: The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 to supersede AD 2019-03-06, Amendment 39-19558 (84 FR 5587, February 22, 2019) (“AD 2019-03-06”). AD 2019-03-06 applied to certain The Boeing Company Model 737-300, -400, and -500 series airplanes. The NPRM published in the Federal Register on March 9, 2020 (85 FR 13581). The NPRM was prompted by a report indicating that the PSUs became separated from their attachments during several survivable accident sequences, and by the determination that additional actions are necessary for five airplanes. The NPRM proposed to retain the requirement to install lanyard assemblies on PSUs and, for certain airplanes, on the life vest panels. The NPRM further proposed to require installing lanyard assemblies on the life vest panels for those five airplanes on which installation was not originally required. The FAA is issuing this AD to address the potential for the PSUs to detach and fall into the cabin, which could lead to passenger injuries and impede egress during an evacuation.

FMI: www.regulations.gov

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC