FAA Issues SAIB For Eclipse Ailerons | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Thu, Jan 26, 2012

FAA Issues SAIB For Eclipse Ailerons

Recommends Joint Inspection, Replacement If Necessary

The FAA has issued a Special Airworthiness Information Bulletin (SAIB) directed towards owners and operators of Eclipse Aerospace, Inc. EA500 model series aircraft (under Type Certificate Data Sheet A00002AC) of an airworthiness concern. Specifically, this SAIB provides guidance for inspection of the aileron joints and replacement with redesigned parts.

For now, the FAA says this airworthiness concern has not been determined to be an unsafe condition that would require an AD to be issued.

The FAA says it has received reports of increased lateral stick force. Investigation determined that possible corrosion of the aileron joint assembly bearing or shaft resulted in aileron friction being out of tolerance. Eclipse Aerospace, Inc. has developed Alert Service Bulletin (ASB) 500-27-004, Revision B. This bulletin provides instructions for performing inspections within 50 flight hours, and thereafter at every 100 flight hour intervals. The bulletin also provides instructions for replacing certain parts in the aileron system. Replacement of the parts in accordance with the alert service bulletin terminates the need for the repeat inspections.

This SAIB is being issued because the FAA continues to receive service difficulty reports that indicate the issue is continuing to be found on aircraft and the agency wants to increase awareness and compliance with the Eclipse alert service bulletin.

The FAA recommends the inspection of the ailerons at the time intervals and using the inspection procedures directed in Eclipse Alert Service Bulletin 500-27-004, Revision B, dated September 8, 2008. Inspections should continue until part replacement in accordance with paragraph 3.D. of the alert service bulletin.

FMI: SAIB

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC