AD: Engine Alliance Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Jan 15, 2019

AD: Engine Alliance Turbofan Engines

AD NUMBER: 2018-22-07

PRODUCT: All Engine Alliance (EA) GP7270, GP7272, and GP7277 model turbofan engines.

ACTION: Final rule; request for comments.

SUMMARY:  This AD requires inspection of the stage 6 seal ring for correct installation and inspection of the high-pressure compressor (HPC) stages 2-5 spool for cracks.

This AD also requires replacement of the HPC stages 2-5 spool if the stage 6 seal ring is incorrectly installed or if the HPC stages 2-5 spool is found cracked.

This AD was prompted by a shop finding of axial cracks in the interstage 5-6 seal teeth of the HPC stages 2-5 spool spacer arm, due to an incorrectly installed stage 6 seal ring.

DATES: This AD is effective January 11, 2019. Comments must be received by February 11, 2019.

COST: The FAA estimates  that this AD affects zero engines installed on airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • Borescope inspection of stage 6 seal ring and interstage 5-6 seal teeth forward and aft faces only: 4 work-hours × $85 per hour = $340 per aircraft.
  • Replacement of HPC stages 2 to 5 spool: 8 work-hours × $85 per hour = $680. Parts: $346,540. Cost per airplane: $347,220.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC