FAA Issues NPRM On Parachute Packing Intervals | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Tue, May 22, 2007

FAA Issues NPRM On Parachute Packing Intervals

Proposes Change To 180-Day Repacking Timeframe

The Federal Aviation Administration has issued a Notice of Proposed Rulemaking (NPRM), regarding proposed changes to the packing interval for certain types of parachutes.

Currently, the FAA requires that most parachutes may not be used or carried aboard an aircraft and available for emergency use unless they have been packed within the previous 120 days. New reliability data from the parachute industry and other sources indicate it is time to review the packing interval, however, and the FAA is asking for public comment on a proposal to lengthen the interval from 120 to 180 days.

Citing data from the US military and industry representatives, the FAA says the current 120-day packing interval may be too short. Experts assert modern parachute materials last longer when the packing interval is longer than 120 days, and that too-frequent packing may shorten the life of the materials.

Those experts found the parachute's porosity was affected by handling and manipulation of the parachute while being packed. The FAA is proposing 180 days as a more suitable packing interval for modern parachute systems, adding such an extension would also result in a "minor" cost saving for parachutists.

The effect of the proposal is to ensure the rules reflect the safest parachute packing interval. In this rulemaking, the FAA is also proposing several correcting amendments to the rules related to parachute operations.

Comments on the NPRM are due before August 20, 2007.

FMI: Read The Full NPRM

Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC