Aero-TV: Gulfstream G650 -- NBAA 2011 Production Update | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Nov 16, 2011

Aero-TV: Gulfstream G650 -- NBAA 2011 Production Update

Gulfstream's Fly-by-Wire BizJet Gets Ready For Prime-Time

Just a few weeks ago, the power players at Gulfstream updated one and all on the final details leading up to eventual production of Gulfstream's most ambitious and capable bizjet, yet, the G650.

Gulfstream officials noted that the aircraft has moved several steps closer to its anticipated certification later this year after completing tests of its fly-by-wire system, engine inlet compatibility and operation in hot weather, among other tests. At the time of this update, the four aircraft remaining in the flight-test program had accumulated more than 2,077 hours on more than 626 flights.

“On Sept. 15, we had five G650 aircraft in the air at once,” said Pres Henne, senior vice president, Programs, Engineering and Test, Gulfstream. “Four of the aircraft were conducting flight-test activities, while the fifth aircraft completed a post-production test flight. The level of flight activity speaks to the maturity of the product at this point in the flight-test program. We are moving at a prudent pace toward our certification objective later this year. We are pleased by everything we see.”

Gulfstream has now flown four production aircraft in preparation for induction into final-phase manufacturing, where the aircraft are outfitted and painted. Fourteen aircraft are in the production process. On the flight-test side, Aircraft Number 6005 completed certification ground tests for engine inlet compatibility, conducted for the first time by Gulfstream at the Eglin Air Force Base test facility in Florida. The aircraft utilized Eglin’s fan array to accurately provide the high-wind ground testing. Additionally, the aircraft completed certification ground tests for electromagnetic interference. Following ground testing, the aircraft successfully completed in-flight certification testing in both areas: engine inlet compatibility and electromagnetic interference.

Aircraft Number 6004, the first Gulfstream test aircraft to have a fully outfitted interior, has conducted in-flight tests on the functionality of the G650’s next-generation flight management system, a fundamental part of the avionics, as well as completing extensive cabin system tests and interior acoustic noise surveys. The company completed the Federal Aviation Administration certification tests for hot-weather operations using Aircraft Number 6003, thereby demonstrating the capability to properly cool all of the avionics and electrical equipment under the most extreme conditions.

Gulfstream announced the G650 program on March 13, 2008. On Sept. 29, 2009, the aircraft rolled out under its own power in front of a crowd of more than 7,000 people. It completed its first flight on Nov. 25, 2009, and remains on schedule for entry-into-service in 2012.

FMI: www.gulfstream.com, www.aero-tv.net, www.youtube.com/aerotvnetwork, http://twitter.com/AeroNews

 


Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC