Elements For The First A350 XWB Horizontal Tail Begin To Take Shape | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Tue, Aug 02, 2011

Elements For The First A350 XWB Horizontal Tail Begin To Take Shape

Finished Elements Will Be Shipped To Toulouse, France For Final Assembly

Production on a key component in the A350 XWB’s initial horizontal tail plane has begun, marking a new industrial milestone for Airbus’ new-generation widebody jetliner family. This activity is being performed at Airbus’ centre of excellence in Puerto Real, Spain, and involves build-up of the horizontal tail plane’s lateral box in a combined effort with primary partner company Aernova.

Measuring some 30 feet long and from 4.5 and about 13 feet wide, the A350 XWB horizontal tail plane’s lateral box is composed primarily of carbon fibre – with its few metal components made of titanium alloys and aluminium.

After assembly is complete, the lateral boxes will be sent to Airbus’ facility in Getafe, Spain – where production of additional A350 XWB components is underway – for joining with the elevators and completion of the horizontal tail plane. The finished element then is to be transferred to the jetliner’s final assembly line in Toulouse, France. 

Airbus’ Puerto Real facility is used for the automated assembly of movable surfaces, final equipment processes and delivery of large structural components to the final assembly line in Toulouse. Its own assembly capabilities consist of a mobile line spread across five interlinked stations: main structure and trailing edge assembly; structural assembly of lateral boxes; automated drilling and riveting; trailing edge equipment; and final operations.

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC