FAA To Hilton Head: Runway Less Than 5,000 Feet Not Worth The Cost | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Oct 14, 2010

FAA To Hilton Head: Runway Less Than 5,000 Feet Not Worth The Cost

A 700 Foot Extension Would Preserve Existing commercial Service

The FAA has told Hilton Head Island airport (KHXD) officials that any proposal to extend the runway on the resort island to less than 5,000 feet would receive a cool reception from the agency, and would be difficult to justify in terms of funding.

In a letter sent to county administrator Gary Kubic, the FAA's Scott Seritt said that an extension of less than 700 feet "would not justify the cost."

The argument is a familiar one pitting residents living near the airport against the airports' desire for a longer runway. The Island Packet reports that consultants studied extensions of 300, 700, and 1,100 feet, and some town officials have said that the 700 foot option would preserve the turboprop-based commercial service to the airport, increasing safety for those aircraft while minimizing disruptions to the surrounding residential neighborhoods. But the 5,000 foot runway would still not be sufficient for larger business jets or regional jets operated by the airlines. Regional jets would require a runway of at least 6,500 feet.

The FAA seems to be pushing Hilton Head to go for the longest option studied, a 5,400 foot runway. Seritt said in his letter that if the county does not make the longest possible extension now, the funds for such projects might not be available in the future.


KHXD

The paper reports that county administrator Kubic said the likelihood of reduced federal funding for the shortest option make it "very unlikely," and that a 5,000 foot runway seemed to be a good compromise. He said that the airport does not generate enough revenue to undertake any runway extension without the 95 percent funding offered by the FAA. State and local sources split the remaining 5 percent.

FMI: http://bcgov.net/about-beaufort-county/transportation/hhi-airport/index.php, www.faa.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC