Discovery Launch Delayed Until At Least Thursday | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Nov 03, 2010

Discovery Launch Delayed Until At Least Thursday

Electrical Problem Is The Culprit

The Space Shuttle Program Mission Management Team decided to delay the final launch of Discovery by at least one day. The shuttle is scheduled for an 11-day mission to the International Space Station.

The Prelaunch Mission Management Team wants to give engineers more time to look deeply into two electrical issues from a main engine computer controller that cropped up Tuesday morning. Mike Moses, chair of the MMT, said the problems are believed to be tied to a circuit breaker in the shuttle's cockpit.

Rather than rush the shuttle launch team through an analysis and launch cycle quickly, Moses said he opted to let the engineers work throughout the night on the issue without having to worry about an early morning tanking and Wednesday afternoon launch. The MMT will meet again Wednesday at 1400 EDT and then decide whether to try to launch Thursday. A liftoff Thursday would be at 1529.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC