NASA: Maybe a Year Before Next Shuttle Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Oct 03, 2003

NASA: Maybe a Year Before Next Shuttle Flight

Mid-September New Target Date

Suddenly concerned in public that perhaps some corrosion on Atlantis might have gone unnoticed, reports are coming from NASA that the next Shuttle mission could be launched no earlier than mid-September, 2004.

NASA spokesman James Hartsfield said that such problems were discovered and fixed on Discovery and Endeavour.

The last 'heavy' maintenance Atlantis received (other than during the unrelated flat-panel cockpit upgrade three+ years ago) was in 1997~98, when Hartsfield said the agency admitted it may not have checked deeply enough for troubles possibly lurking under the nose cap of Atlantis. "The reason we are discussing this is to understand whether removing the nose cap and inspecting it is something we need to do to make sure Atlantis’s thermal protection system is safe for flight," Hartsfield said.

Why Discovery or Endeavour couldn't be ready sooner -- perhaps the next missions are so specific that particular equipment couldn't be transfered -- was not discussed.

Of course, if the launch date slips much past the end of September, the shorter days (NASA recently amended its flight rules to allow only daylight shuttle launches) and colder nights (ice, O-ring shrinkage) could delay a launch until the Spring of 2005. Meanwhile, the ISS crew keeps it together, performing construction and experiments on a greatly-amended schedule, relying on the Russian Soyuz program to keep the Station going, and manned.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC