Boeing Delivers 6th P-8I Maritime Patrol Aircraft To India | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Nov 30, 2014

Boeing Delivers 6th P-8I Maritime Patrol Aircraft To India

Final Two Deliveries Scheduled Next Year

Boeing delivered the sixth P-8I maritime patrol aircraft to India Nov. 24. The airplane arrived at Naval Air Station Rajali to join five others being used by the Indian Navy. 

The P-8I is part of a contract of eight awarded in 2009. The final two deliveries are scheduled for 2015. 

“The P-8I’s arrival in India is another key milestone for the program and marks our final delivery of the year,” said Dennis Swanson, vice president, Boeing Defense, Space & Security in India. “The Indian Navy is currently conducting missions with the first five aircraft, and this newest P-8I will begin flight trials in the coming months.”

Based on the company’s Next-Generation 737 commercial airplane, the P-8I is the Indian Navy variant of the P-8A Poseidon that Boeing builds for the U.S. Navy.  

The P-8I incorporates not only India-unique design features, but also Indian-built sub-systems that are tailored to meet the country’s maritime patrol requirements. The P-8I features open systems architecture, advanced sensor and display technologies, and a worldwide base of suppliers, parts, and support equipment. “We have a great partnership with India, which has helped us keep the program on schedule and on budget,” said Mark Jordan, Boeing P-8 International program manager.       

In order to efficiently design and build the P-8I and the P-8A, the Boeing-led team is using a first-in-industry, in-line production process that draws on the company’s Next-Generation 737 production system.

(Image provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC