FAA Proposes A Significant Rewrite Of Part 145 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, May 22, 2012

FAA Proposes A Significant Rewrite Of Part 145

AEA Calls The Changes 'Potentially Damaging'

The FAA has put forth a  proposal to make wholesale changes to the avionics industry, and a major trade organization says those changes would have damaging and costly repercussions. The agency proposes to remove radio and instrument ratings and allow airframe-rated repair stations to work on radio and instrument components without qualifications or ratings. In addition, the proposal eliminates many of the currently utilized opportunities for mobile maintenance operations.

Under this proposal, the system of ratings would be reduced from eight ratings to five ratings. The ratings definitions would be revised to clearly indicate the type of work that a repair station is authorized to perform. This proposal would not require a capability list, but would revise the capability list recording requirements for those repair stations that choose to use one. This is a potentially marked change for repair stations with class ratings that do not currently have a capability list of the items they maintain.
 
A certificated repair station with an airframe rating is not required to obtain a separate component rating to maintain articles associated with its rating and capabilities. This provision would allow airframe-rated repair stations to repair and alter radios and instruments without any specific ratings or obvious qualifications.

Each certificated repair station must provide and maintain suitable permanent housing for the facilities, equipment, materials and personnel consistent with its ratings. It appears this provision would prohibit mobile operations. Currently, the regulations allow for a permanent "fixed location" but not permanent housing.

The Aircraft Electronics Association is thoroughly investigating the NPRM and will respond to all members with our commentary within the next two weeks. Since comments are due before the start of the AEA domestic Regional Meetings, the Association will be leveraging our normal communication mediums, as well as Web-based sessions. The membership should watch the AEA Wired e-newsletter and the AEA website for more communications and upcoming schedules.

Comments on the proposal are due to the FAA no later than Aug. 20, 2012.

FMI: Repair Station NPRM, www.aea.net

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC