Adding Insult To Injury: Boeing to Pay at Least $17M to FAA | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, May 28, 2021

Adding Insult To Injury: Boeing to Pay at Least $17M to FAA

Required To Settle Enforcement Cases on 737 -- Will Also, "Undertake Multiple Corrective Actions"

Boeing will pay at least $17 million in penalties and undertake multiple corrective actions with its production under a settlement agreement with the FAA.

The FAA found that the Chicago-based manufacturer installed equipment on 759 Boeing 737 MAX and NG aircraft containing sensors that were not approved for that equipment; submitted approximately 178 Boeing 737 MAX aircraft for airworthiness certification when the aircraft potentially had nonconforming slat tracks installed; and improperly marked those slat tracks.

“Keeping the flying public safe is our primary responsibility. That is not negotiable, and the FAA will hold Boeing and the aviation industry accountable to keep our skies safe,” said FAA Administrator Steve Dickson.

Boeing will pay the $17 million penalty within 30 days after signing the agreement. If Boeing does not complete certain corrective actions within specific timeframes, the FAA will levy up to $10.1 million in additional penalties.

The corrective actions include but are not limited to:

  • Strengthening procedures to ensure that it does not install on aircraft any parts that fail to conform to their approved design.
  • Performing Safety Risk Management analyses to determine whether its supply-chain oversight processes are appropriate and whether the company is ready to safely increase the Boeing 737 production rate.
  • Revising its production procedures to enable the FAA to observe production rate readiness assessments, the data on which the company bases the assessments, and the results of the assessments.
  • Taking steps to reduce the chance that it presents to the FAA aircraft with nonconforming parts for airworthiness certification or a Certificate of Export.
  • Enhancing processes to improve its oversight of parts suppliers.

The FAA will continue its oversight of Boeing’s engineering and production activities and is actively implementing oversight provisions from the 2020 Aircraft Certification, Safety, and Accountability Act. 

FMI: www.faa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC