Orbital Rolls Out Antares Rocket | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Apr 09, 2013

Orbital Rolls Out Antares Rocket

Erected On Launch Pad At Wallops Island For Upcoming Test Flight

Orbital Sciences Corporation rolled out the first fully integrated Antares rocket from its assembly building at NASAs Wallops Flight Facility (WFF) in eastern Virginia early Saturday morning in preparation for its inaugural flight that is scheduled for April 17 at approximately 1700 (EDT).

The rollout began at about 0430 Saturday morning. The Antares rocket was transported about one mile to the Mid-Atlantic Regional Spaceport (MARS) launch pad complex aboard the Transporter/Erector/Launcher (TEL), a specialized vehicle that also raises the rocket to a vertical position on the launch pad and serves as a support interface between the rocket and the launch complex's systems.
 
With the completion of the Antares roll out, Orbital says they are on a clear path to a launch date of April 17, provided there are no significant weather disruptions or major vehicle check-out delays between now and then, said Michael Pinkston, Orbitals Antares Program Manager. By Saturday afternoon,the Antares rocket was in a vertical position and fully integrated with the launch mount on the MARS pad.

The Antares test flight, dubbed the A-ONE mission, is the first of two missions Orbital is scheduled to conduct in 2013 under its Commercial Orbital Transportation Services (COTS) Space Act Agreement with NASA. Following a successful A-ONE launch, Orbital will carry out a full flight demonstration of its new Antares/Cygnus cargo delivery system to the International Space Station (ISS) around mid-year. In addition, the company is also scheduled to launch the first of eight operational cargo resupply missions to the ISS in 2013 under the Commercial Resupply Services (CRS) contract with NASA. All COTS and CRS flights will originate from NASAs WFF, which is geographically well suited for ISS missions and can also accommodate launches of scientific, defense and commercial satellites to other orbits.
 
The Antares medium-class launch system will provide a major increase in the payload launch capability that Orbital can provide to NASA, the U.S. Air Force and other customers. The Antares rocket will launch spacecraft weighing up to 14,000 lbs. into low-Earth orbit, as well as lighter-weight payloads into higher-energy orbits. Orbitals newest launcher is currently on-ramped to both the NASA Launch Services-2 and the U.S. Air Forces Orbital/Suborbital Program-3 contracts, enabling the two largest U.S. government space launch customers to order Antares for right-size and right-price launch services for medium-class spacecraft.

FMI: www.orbital.com


Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC