Test Flight Completed After F-35B Modifications | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Jul 01, 2015

Test Flight Completed After F-35B Modifications

Air Force Sustainment Center Commander Calls Flight 'Eye-Watering'

The Ogden Air Logistics Complex completed an F-35B Lightning II functional check flight at Utah's Hill AFB  June 18, after the first depot-level short take off and vertical landing modifications were completed on two F-35Bs for the Marine Corps.

Lt. Col. Kevin Hall, a member of the 514th Flight Test Squadron and the first depot test pilot in the Air Force qualified in the F-35B, took off from Hill Air Force Base and zoomed to altitude before heading to the Utah Test and Training Range for a functional check.
 
As he returned to base, Hall converted the versatile aircraft for short takeoff vertical landing operations and performed a "short" landing and a "rolling" takeoff.
 
Witnessing the successful flight was "eye-watering," said Lt. Gen. Lee Levy II, the commander of the Air Force Sustainment Center.
 
The Marine Corps sent two F-35Bs to the Ogden Air Logistics Complex on Feb. 2, 2015, for depot-level modifications. The jets came to Hill AFB from the Marine Corps with less than a week's notice.
 
In just over four months, workers completed the modifications necessary for the F-35B's initial operational capability, putting in 24,000 hours to get the job done.
 
"The work accomplished by the men and women of the 570th Aircraft Maintenance Squadron has been nothing short of amazing," said Brig. Gen. Carl Buhler, the Ogden Air Logistics Complex commander.

Completing the modifications on time required the maintainers to overcome numerous challenges, Buhler said. They removed sections of the aircraft that many thought would never be removed, and they strengthened wing ribs and worked in areas that required rare "micro tolerances."

"In the process, the maintainers developed techniques that will be used as benchmarks in a variety of depot operations in the future," Buhler said. "The accomplishments of the members of the squadron -- in concert with our Lockheed Martin teammates, with the support of the 75th Air Base Wing -- have been remarkable."
 
The second F-35B is scheduled to be completed in the coming days.
 
"I couldn't be prouder of you and the support we're providing to our joint partners,” Levy said in a message to the workforce. “The Marines were counting on us, and you delivered."

(USAF Image)

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC