NASA Names MacDill AFB As Possible Shuttle Landing Site | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Feb 29, 2004

NASA Names MacDill AFB As Possible Shuttle Landing Site

NASA officials have named MacDill AFB as an alternate landing site for future space shuttle missions. Alternate sites are typically selected based on weather conditions or the power level of the shuttle during re-entry. Software updates to the shuttles’ landing programs make it possible to land at more locations than previously available, said Marty Linde, director of landing support at Johnson Space Center in Houston.

"The new software, which was scheduled to be installed before the accident last year, expands the possible landing sites from 25 to 45," said Mr. Linde.

One of the key reasons for MacDill being chosen was its location, said Mr. Linde. "We went with what made the most sense geographically," he said.

As the processing and launch site of the space shuttle, NASA's Kennedy Space Center in Cape Canaveral, Fla., is the preferred end-of-mission landing site for the shuttle orbiter. Since MacDill is only 138 miles away from Kennedy, it is roughly 2,500 miles closer than the main site used in the past as an alternate, Edwards Air Force Base, Calif.

Landing the orbiter here instead of in California saves processing time for its next mission and the expense of returning it to NASA. A local landing also reduces the time the shuttle would be exposed to the uncertainties and potential dangers of a ferry trip atop one of NASA's two modified Boeing 747 shuttle carrier aircraft.

"There aren't too many agencies on base that wouldn't be affected [if the shuttle should land there]," said Mr. Linde. From air traffic control to fire, crash and rescue, as well as security forces and medical personnel, there are hundreds of people on base who would be involved. That is along with the team of more than 500 Department of Defense, NASA and contracted civilians from various agencies throughout the country.

MacDill workers will undergo extensive training in late April to support a shuttle landing. Training will be spearheaded by the DOD's manned space flight support office at Patrick AFB, Fla.

Maj. Russell Wood, deputy chief of the training division here, said the initial "turn around brief," includes three days of training covering multiple aspects of shuttle operations.

"It's basically 'Space Shuttle 101'," said Major Wood. "The majority of the training is for on-scene commanders, but will also include the full gambit of those who would be involved in an emergency landing.'"

All training aspects will be covered in-depth long before the shuttle is scheduled to launch again in March 2005, said Major Wood, adding that the base could have as little as 30 minutes notice before a shuttle landing.

"The probability that it (landing at an alternate site) will actually happen is low, but it sure is nice to know the support is there," said Mr. Linde. [ANN Thanks Staff Sgt. Randy Redman, 6th Air Mobility Wing Public Affairs]

FMI: www.af.mil, www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC