DOD Details VXX Work Split Locations | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sun, Jan 30, 2005

DOD Details VXX Work Split Locations

Over A Third Of The Work To Be Performed Outside The United States

The Department of Defense has issued a statement detailing the amount of work that will be performed on the Lockheed-Martin VXX presidential helicopter replacement, by city, state and country.

The Systems Development and Demonstration phase of the contract, which ANN previously reported totalled just under $1.8 billion, consists of engineering design and integration work for the myriad communications, navigation and mission systems required to perform the support mission for the President of the United States.

The phase also includes a comprehensive test and evaluation program, and production of five aircraft to introduce the operational capability. The locations where the SDD work will be performed, and the percentage of work assigned to each, are:

  • Owego (NY), 31 percent
  • Amarillo (TX), 27 percent
  • Yeovil, United Kingdom, 21 percent
  • Agusta, Cascina Costa, Italy, 15 percent
  • Lynn (MA), 3 percent
  • Rancho Santa Margarita (CA), 1 percent
  • Grand Rapids (MI), 1 percent
  • Denton (TX), 1 percent

The SDD phase is expected to be completed by September 2011, and the contract funds for the program will not expire at the end of this fiscal year. The contracting activity for this program is the Naval Air Systems Command, Patuxent River (MD).

FMI: www.dod.gov

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC