Robinson Helicopter Obtains Approval for Pressure Fueling System | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Jan 20, 2023

Robinson Helicopter Obtains Approval for Pressure Fueling System

Option for New Production R66s Enables Rapid Refueling and Turnaround with Waist-Level Port

Robinson has received approval for its R66 pressure refueling system, available on all new production models going forward.

The 13-pound system enables consistent, rapid refueling from waist level, doing away with the difficulty of stools and ladders to access higher refueling positions. The new fuel cap allows operators to enjoy much faster turnaround between flights, no matter the fuel quantity added. The system consists of more than just a fuel filler cap, with an additional control panel to mark full or partial fuel loads, as well as audio alerts in case of errors in the fuel system during takeoff. For added safety, overfill and overpressure prevention is baked into the system.

In the special conditions doc issued by the FAA, the system is described as providing "faster, easier, and safer refueling", particularly "when the engines are running and rotors turning compared to the existing fueling system located on the top of the main fuel tank." It notes that the pressure refueling system includes a crash-resistant fuel hose that runs from the fueling port on the right side to an inlet at the top of the fuel tank on the helicopter's left side, and that the system does not accommodate defueling.

Unfortunately for current R66 owners, the pressure refueling suite is not available as a kit at this time. It may only be had as an added factory option starting at $18,000.

FMI: www.robinsonheli.com

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC