Boeing 787 Dreamliner Program Completes Static Test Analysis, Gauntlet Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Dec 12, 2009

Boeing 787 Dreamliner Program Completes Static Test Analysis, Gauntlet Tests

First Flight "Window" Opens December 15th

Boeing completed the review and analysis of the static test that was conducted Nov. 30 on Thursday, validating the side-of-body modification made to the 787 Dreamliner. "I am happy to report that the program has validated the airplane structure for the 787 Dreamliner," said Scott Fancher, vice president and general manager of the 787 program.

Fancher also reported that the 787 team has completed final gauntlet testing on the first airplane. Testing lasted for just two days because only improvements made earlier this year during previous testing had to be examined. "We are very pleased with the results of this final functional testing. With the successful completion of static testing and this functional testing, our focus now moves to first flight."

During the test on the 787 Dreamliner static test airframe, the wing and trailing edges of the airframe were subjected to their limit load -- the highest loads expected to be seen in service. The limit-load test was required to clear the airplane for first flight. Boeing's test strategy is to conduct all limit-load tests and analyze data before conducting the ultimate load series, which is required for certification and will be conducted next year.

Boeing announced June 23 that it was necessary to reinforce an area of structure at the side-of-body section of the 787. The modification entails installing new fittings at 34 stringer locations within the joint where the wing attaches to the fuselage. The 787 team has completed modifications on the first three flight-test airplanes and the full-scale static test airplane.

First flight of the 787 Dreamliner is expected to occur after final flight readiness reviews, receipt of documentation from the U.S. Federal Aviation Administration and taxi testing. Both taxi testing and first flight are subject to weather conditions.

"We are pleased with the pace of progress in preparing to enter our flight test program," said Fancher.

So we know what you're thinking. "Just go fly the darn thing already!" Well, Boeing says on it's website that the "window" for the first flight opens on December 15th. "This date is dependent on final internal reviews, taxi tests and receiving the final experimental ticket from the U.S. Federal Aviation Administration," the company said in a media notice.

FMI: www.boeing.com

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC