2nd Ariane 5 To Be Launched This Year Enters Assembly Process | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Mar 11, 2010

2nd Ariane 5 To Be Launched This Year Enters Assembly Process

Ariane Plans A Total Of Seven Mission In 2010

The Ariane 5 for Arianespace's second dual-payload flight of 2010 has begun its assembly as the Spaceport in French Guiana is once again the center of activity for two parallel missions.

This latest Ariane 5 began taking shape earlier in the week as its cryogenic core stage was positioned over a mobile launch table in the Spaceport's Launcher Integration Building. It was then joined by the vehicle's two solid boosters for mating.

The second mission of 2010 will utilize a heavy-lift Ariane 5 ECA version of Arianespace's workhorse launcher, and will carry two telecommunications satellites.

As the launch campaign begins for this flight, another Ariane 5 ECA is in the Spaceport's Final Assembly Building, where it is awaiting the integration of its two satellite passengers: ASTRA 3B & COMSATBw-2. The liftoff of this year-opening Arianespace launch is set for March 24.

Arianespace is targeting a total of seven Ariane 5 missions during 2010 while preparations also continue for the upcoming introductions of the medium-lift Soyuz and lightweight Vega launcher in side-by-side operations at the Spaceport.

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC