ISS: Expedition 8 Crew Staying Busy | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Dec 09, 2003

ISS: Expedition 8 Crew Staying Busy

ISS Status Report #03-62, 4 p.m. CST, Friday, Dec. 5, 2003

Expedition 8 Commander and NASA ISS Science Officer Mike Foale and Flight Engineer Alexander Kaleri Friday wrapped up a busy week aboard the International Space Station. ISS activities included scientific experiments ranging from behavior of plasma dust subjected to radio waves in a vacuum to investigation of stresses on the feet and legs during spaceflight.

Kaleri completed the first run of the Russian Plasma Crystal-3 experiment on Thursday, after preparations on Monday and experiment setup on Tuesday. The largely automated experiment studies crystallization of plasma dust subjected to high-frequency radio waves in a vacuum chamber.

On Tuesday, Foale spent much of his day in instrumented biking tights for the Foot/Ground Reaction Forces During Spaceflight (FOOT) experiment. The Lower Extremity Monitoring Suit, the cycling tights outfitted with 20 sensors, measured forces on Foale’s feet and joints and muscle activity while he went about his scheduled activities. Investigators believe the experiment will provide additional information on reasons for bone and muscle loss by people in space. That knowledge could lead to better ways to minimize such problems.

Also completed during the week was spacesuit battery maintenance – discharging and recharging the batteries, reloading of laptop computers, continued participation by crewmembers in the Renal Stone experiment, regular maintenance and standard crew exercise sessions.

On Thursday crewmembers did an inspection of the Treadmill Vibration Isolation System, the treadmill in the Zvezda Service Module mounted on a sophisticated system that minimizes transmissions of vibrations created by exercising crewmembers. Both also ran on the treadmill with its Vibration Isolation and Stabilization turned off. Instruments they had set up earlier in Zvezda and the Unity node monitored vibrations produced. Crewmembers have approval to use the TVIS in a modified configuration.

They are scheduled to spend at least four hours on Tuesday and four hours on Wednesday removing the TVIS from its housing for inspection and possible repair of a stabilizing gyroscope. Today Foale talked with TVIS experts at Johnson Space Center in preparation for next week's work with the treadmill.

The TVIS and several other exercise devices aboard the ISS are used about 2½ hours each day by each crewmember. The exercise is designed to mitigate some of those negative effects of long-term spaceflight.

On Tuesday Foale and Kaleri talked with CBS' "Osgood Files" and with reporters from CBS Radio. Foale spent more than 15 minutes on Thursday chatting with Sir David Frost for the BBC's "Breakfast with Frost" program.

FMI: http://spaceflight.nasa.gov, http://scipoc.msfc.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC