Boeing Begins Final Assembly Of 1st Production P-8A Poseidon | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Mar 14, 2011

Boeing Begins Final Assembly Of 1st Production P-8A Poseidon

Delivery On Track For 2012

Final assembly has gotten underway on the first Navy P-8A Poseidon production aircraft in the Boeing's Renton factory. The P-8A is the first of six low-rate initial production aircraft that Boeing is building as part of a $1.6 billion contract awarded by the Navy in January. The Navy plans to purchase 117 of the Boeing 737-based P-8A anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft to replace its P-3 fleet.


Poseidon Final Production

“Boeing will deliver this first aircraft to the Navy on schedule in 2012 in preparation for initial operational capability, which is planned for 2013,” said Chuck Dabundo, Boeing vice president and P-8 program manager. “Our team has built seven P-8A test aircraft to date and the process improvements and efficiencies we’ve incorporated will continue to help reduce costs as the program moves forward.”

The Poseidon team is using a first-in-industry in-line production process that draws on Boeing’s Next-Generation 737 production system. All aircraft modifications unique to the P-8A are made in sequence during fabrication and assembly. The start of final assembly follows Spirit AeroSystems’ delivery of the P-8A fuselage to Boeing. The fuselage arrived via rail car on March 7 and was loaded into a tooling fixture. Boeing workers have begun installing systems, wires and other small parts.


File Photo

“We’re excited to transition from the development airplanes to production,” said John Pricco, Boeing Commercial Airplanes P-8 program manager. “Our team’s tremendous work has put us in a good position as we ramp up to build both the P-8A for the United States and the P-8I for India.”

Boeing was awarded a System Development and Demonstration contract in 2004 to build and test six flight-test and two ground-test P-8A aircraft. The first three flight-test planes -- T1, T2 and T3 -- are completing testing at Naval Air Station Patuxent River, Md. The program’s static test plane, S1, completed its test program earlier this year.

FMI: www.boeing.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC