FAA Extends Comment Period For Controversial Air Tour Rule | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Jan 21, 2004

FAA Extends Comment Period For Controversial Air Tour Rule

NATA Has Serious Concerns About The NPRM

The FAA has extended the comment period from January 20 to April 19, 2004 for the proposed NPRM that would require Part 91 sightseeing operations to be certificated under Part 135. Last November, NATA filed comments with the DOT requesting an extension on the deadline for comments. "We are concerned that requiring these sightseeing operations-most of which are small businesses-to undergo Part 135 certification will place an untenable financial burden on them and force them out of business," stated director of government and industry affairs Eric Byer.

"The additional time will give us and our members time to reply and document our concerns to the FAA.

"From a safety standpoint the FAA has not justified-to our satisfaction- that there is a need for these sightseeing operations to have a Part 135 certificate," continued Byer.

"Nor have they justified the economic impact of the rule on the businesses, which they are required to do. In fact, the FAA stated that of the 1,700 operators likely to be impacted by the rule, at least 700 are likely to go out of business. That's patently unacceptable."

A review of the accidents cited by the FAA as demonstrating the need for additional regulations shows that the majority (8 of 11) accidents occurred in Hawaii where air tours are already subject to special requirements under SFAR-71. Of the 11 accidents, only three involved aircraft operating under Part 91.

"We appreciate the extension and look forward to working with the FAA on this proposed NPRM," concluded Byer.

FMI: www.nata-online.org, www.nata-online.org/2GovWatch/Pdf/10-03.air-tour-nprm.pdf

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC