First Manufacturing Validation Unit For Lear 85 Ready For Use | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Jul 14, 2010

First Manufacturing Validation Unit For Lear 85 Ready For Use

Will Validate Pre-Production Design Concepts, Manufacturing Process, QA

Bombardier Aerospace says it has successfully built the first all-composite manufacturing validation unit (MVU) for the Learjet 85's pressure fuselage section. The MVU was built in Montreal, where the Learjet 85 aircraft structural design team is located, using actual production tooling and with strong support from the program team based in Mexico. This unit will be used to validate the design concepts, manufacturing processes and quality as the program advances towards the beginning of production, scheduled for later this year.

The 45,000 pounds of production tooling will soon be transferred to its permanent home, the new Learjet 85 aircraft facility in Queretaro, Mexico, where a second MVU will be built.

"This is another crucial step towards the start of production of the first Learjet 85 aircraft," said Ralph Acs, Vice President, Learjet 85, Bombardier Business Aircraft. "Our next step will be to apply what we learn from this first manufacturing validation unit to the second unit, in order to confirm our technology readiness."

"This achievement is a further illustration of our commitment to developing more efficient aircraft using composite structures," said Francois Caza, Vice President and Chief Engineer, Bombardier Aerospace. "It is an important step in our comprehensive strategic technology program to design and build the most efficient aircraft structure."

Construction of the Learjet 85 aircraft manufacturing facility in Queretaro is progressing to plan. The first tooling is scheduled for installation at the Queretaro facility this month and the first production part will be built soon afterwards. The Learjet 85 aircraft program is progressing full-speed ahead and the aircraft is on schedule for entry into service in 2013.

FMI: www.bombardier.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC